Compliance Checklists
Job-type specific AS/NZS 3000 compliance checklist — print and tick off on site before sign-off.
Select job type
New Domestic
New house install — full AS/NZS 3000 compliance. Switchboard, wiring, GPOs, earthing & testing.
✓
Board Upgrade
Switchboard upgrade or alteration — mandatory RCD upgrade, existing wiring check, directory.
✓
Solar Install
Solar PV — DC side (AS/NZS 5033), AC side, inverter compliance, DNSP notification & testing.
✓
EV Charger
EV charger install — dedicated circuit, Type A/B RCD, DNSP notification, commissioning test.
✓
Pool / Spa
Pool or spa electrical — zone compliance, equipotential bonding (critical), RCD protection, 12V SELV lighting & bonding resistance test.
✓
Job details (printed on PDF)
Checklist preview
New Domestic Installation
AS/NZS 3000:2018 — Section 2, 3, 8
These checklists are a field guide — not a substitute for the full AS/NZS 3000:2018 standard. A licensed electrician must verify all compliance items. Clause references are paraphrased for on-site use.